The request usually sounds simple. A maintenance lead at a plant on Annacis Island wants the pit under a hydraulic press cleaned: oil, hydraulic sludge and compacted grime. The pit is two metres deep, with one ladder and no fan. Dry ice looks perfect: no water to pump out, no blast media to haul up the ladder.

Then someone asks where the gas goes.

That question sits at the centre of dry ice blasting safety. CO2 from the pellets is invisible, has no smell, and is about 1.5 times heavier than air, so in a pit or a basement it settles to the bottom and stays there. Every kilogram of pellets turns into a little over half a cubic metre of gas, and a blasting machine can go through a kilogram a minute. In an open plant bay that gas disperses before anyone notices it. In a closed room it builds up within the first few minutes, and the controls that handle it (airflow, monitoring and a plan for the low spots) have to be in place before the nozzle comes out.

Why CO2 from dry ice collects in low spaces

Dry ice is solid carbon dioxide at -78.5°C. When the pellets hit a surface they shatter and sublimate, going straight from solid to gas. That is why the method leaves nothing behind except the contaminant you knocked off, and why the room fills with CO2.

The white fog misleads people. The cloud around the nozzle is moisture from the air, condensed by the cold, and it clears in seconds. The CO2 itself can’t be seen, so a clear room can still be an unsafe one.

Because the gas is heavier than air, it behaves like water poured into the space. It runs down stairwells, collects in floor drains, elevator pits and trenches, and pools along the floor while the air at head height still reads close to normal. The worker standing to blast may be fine while a coworker kneeling to clear debris breathes a much higher concentration.

How fast a small room fills

Take a basement pump room in an older Mount Pleasant building: 6 by 5 metres, 3 metres high, about 90 cubic metres of air. Blasting at a kilogram of pellets a minute adds roughly 0.54 cubic metres of CO2 every minute.

If no air moved at all, the room average would pass 5,000 ppm (parts per million) in about one minute. That figure is the WorkSafeBC 8-hour exposure limit for carbon dioxide, around twelve times normal outdoor air. Ten minutes of blasting with the door shut would put the average near 6 percent, and the floor would read higher than the average.

What those levels do to a person is well documented. At around 3 percent, breathing speeds up and headaches start. Near 5 percent, people get dizzy and their judgement slips, which is a bad combination on a ladder. Around 10 percent, a worker can lose consciousness within minutes.

Which BC spaces need this planning

Any space where the air doesn’t move freely and the gas has somewhere to settle. On Lower Mainland jobs that usually means:

  • pits under presses, conveyors and stamping lines in Annacis Island, Richmond and Burnaby plants
  • basement mechanical and electrical rooms, especially in older buildings with one door and no exhaust
  • lower parkade levels, sumps and drainage trenches
  • crawlspaces under commercial buildings
  • tank interiors, hoppers and process vessels
  • engine rooms, bilges and holds on vessels at North Vancouver and Fraser River yards
  • walk-in coolers and cold rooms, which are sealed by design

Some of these are confined spaces under Part 9 of the WorkSafeBC Occupational Health and Safety Regulation: enclosed or partly enclosed, not designed for continuous work, with restricted entry and exit. Such a space needs a hazard assessment, written entry procedures, atmospheric testing, a standby person and a rescue plan before anyone goes in.

Dry ice adds a detail that gets missed. A pit that tests clean on Monday morning becomes a hazardous atmosphere once blasting starts, so the assessment has to account for the CO2 the job itself will produce along with whatever is in the space beforehand. A small storage room with the door closed won’t be on any confined space inventory, and it can still hold CO2.

What ventilation on a dry ice job looks like

General ventilation that brings fresh air in near the ceiling and lets it drift out the door does little here. CO2 sits on the floor, so extraction has to pull from the floor.

The usual setup is a portable blower with flexible duct. The intake end goes at the lowest point of the space and the discharge runs outside, well clear of building air intakes and doorways. Make-up air comes in through a door or a second duct; in a pit, that means a duct down to the bottom and fresh air entering from the top.

How much air? Using the pump room numbers, holding the room under 5,000 ppm at a kilogram a minute takes about 120 cubic metres of air movement a minute, a little over 4,000 CFM. Real rooms mix unevenly, so the working target is higher. In practice that means two or three portable blowers or one large unit.

When a space can’t be ventilated to that level, the job changes. A smaller nozzle and a lower pellet rate cut the CO2 output, and blasting in timed intervals with the fans running between them lets the room clear.

Two more sources of trouble sit outside the room. The compressor that drives the blaster is usually a towable diesel unit whose exhaust carries carbon monoxide, so it belongs outdoors, downwind and away from every air intake. The building’s own ventilation can also move CO2 where nobody expects it: a return grille in a basement mechanical room may carry gas to offices upstairs. Your facilities team should know which air handlers serve the work area and whether they get isolated during the job.

Monitoring: why a four-gas meter isn’t enough

Most sites keep four-gas meters for confined space entry. They read oxygen, combustible gas, carbon monoxide and hydrogen sulphide. Standard units don’t read CO2 at all.

The oxygen sensor won’t catch it in time either. Air is about 20.9 percent oxygen, and the usual alarm point is 19.5 percent. For CO2 to push oxygen down that far, it has to make up roughly 6.7 percent of the air, about 67,000 ppm. That is more than thirteen times the 8-hour limit. By the time the oxygen alarm sounds, the CO2 has been dangerous for a while.

Dry ice work in an enclosed space needs a dedicated CO2 monitor with an infrared sensor. A workable arrangement looks like this:

  • a personal CO2 monitor on each worker inside the space, clipped near the breathing zone
  • an area monitor at the lowest point or at floor level near the work, since that’s where gas collects first
  • a two-stage alarm: the first at the 8-hour limit, which means stop blasting and let the fans catch up, and a higher second stage, which means everyone leaves
  • a reading at floor level after blasting stops and before anyone re-enters

That last point catches people out. Pellet fragments left in the pit keep sublimating, and so does a bin of leftover dry ice parked in the room over lunch. Run the fans until the floor reading is back near outdoor background, then go back in.

Noise, cold and the rest of the hazard list

CO2 is the hazard specific to enclosed spaces. The others come along on every dry ice job and get worse in a small room.

Dry ice blasting is loud, well over 100 dBA at the nozzle, and concrete walls amplify it. The BC noise exposure limit is 85 dBA over 8 hours (Part 7 of the Regulation), so the crew wears hearing protection, often plugs and muffs together in small rooms. Ask whether people in the next room need it too.

The pellets are cold enough to burn skin on contact. Crews wear insulated gloves, eye protection and a face shield, because pellet fragments and dislodged material rebound off the walls of a tight space. Blasting also builds static charge, so hoses and equipment are grounded, and in a tank that held fuel or solvent the atmosphere is tested for combustible vapour before work starts.

Dry ice arrives in insulated bins and should wait in a ventilated area, never in a closed room or a vehicle cab with the windows up.

What to organize, and what to ask your contractor

The site knows the space and the contractor knows the process, and duties split roughly along that line. On a site with more than one employer, the Workers Compensation Act requires a prime contractor to coordinate safety, and who that is should be settled in writing before the job.

Before the crew arrives, your side usually covers the room dimensions and every opening, the low points and what connects to them (drains, stairwells, pits, trenches), which air handlers serve the area, the confined space status and entry permit if one applies, where the compressor can park, and how other workers will be kept out of the area and the rooms below it.

Then ask the contractor:

  1. What CO2 monitoring do you bring, and where do the monitors go? A four-gas meter on its own is the wrong answer.
  2. What are your alarm set points, and what does the crew do at each one?
  3. What blower capacity and ducting will you bring for a space this size, and where does the exhaust go?
  4. What pellet rate and nozzle will you run in here, and will you blast in intervals?
  5. Who on the crew is trained for confined space entry, and who is the standby person?
  6. Can you send a WorkSafeBC clearance letter and a certificate of liability insurance before the job?

A crew that plans enclosed-space work properly can answer all six on one phone call. Vague answers to the first three are a reason to slow the booking down.

If laser work is part of the same shutdown, the questions shift to fume and beam control, covered in our guide to laser cleaning safety on a BC site.

How this compares with sandblasting or chemicals in the same space

Every method brings some hazard into a closed room. Sandblasting a pit fills the air with dust. Where the media or the substrate contains crystalline silica, WorkSafeBC expects an exposure control plan, respirators and air monitoring for silica, and the spent media stays behind: several hundred kilograms of grit mixed with oil, carried up the ladder in buckets and shipped out as contaminated waste. Chemical stripping puts solvent vapour into a space with poor airflow and leaves rinse water and sludge behind. Pressure washing turns a press pit into a pool.

With dry ice, the main airborne hazard is CO2, and it leaves with the ventilation air. The crew sweeps or vacuums up the contaminant that came off the surface, and that is the whole cleanup. It is a single gas you can read on a meter and remove by moving air, which makes for a simpler safety plan than silica or solvent, provided someone does the airflow math first. The process and the surfaces it suits are covered on our dry ice blasting page.

What enclosed-space controls add to the price

A typical dry ice blasting job in a Lower Mainland plant runs $1,500 to $8,000, depending on the area, the contaminant and access. Enclosed-space work adds a few line items: extra blowers and ducting, CO2 monitors, time lost to interval blasting, and a standby attendant when the space is a permit-required confined space. As a rough guide, those controls add $300 to $1,200 a day, and the attendant’s labour is the biggest share.

Set that against downtime. Say the press line above that Annacis Island pit is worth $3,000 an hour in output. Half a shift of bucketing used abrasive out of the pit costs $12,000 before disposal fees. The ventilation and monitoring for a full day of dry ice work costs about a tenth of that, and the line restarts as soon as the pit is clean and the floor reading is back to background.

Planning a dry ice job in a closed space

Send us the room or pit dimensions, photos of the openings and low points, and a description of what needs to come off the surface through our quote form, or call 236-660-4248. We work out the airflow and monitoring for the space before the job is scheduled, so your safety lead can review the plan in advance.

Laser Sharks crews are WorkSafeBC compliant and fully insured, and they work under your site safety program and confined space procedures. The company was named CBRB Best Cleaning Services in BC for 2025. We run dry ice jobs in plants, mechanical rooms, parkades and vessels from Richmond, Delta and Annacis Island to Burnaby, North Vancouver and the Fraser Valley.